| Home | Introduction | Experience | Cogeneration Screening Form | Recent Projects | Contact Us |
![]() |
| Cogeneration Screening Form |
| Company / Contact Information: |
| Company Name: | WJ Smith Manufacturing |
| Facility Location | Vermillion, LA |
| Contact Name | Gerry Beaugh |
| Contact Phone | (555) 555-5555 Ext 5555 |
| Contact Fax | (444) 444-4444 |
| Contact Email | gb@wjsmithmfg.com |
| Energy Demand: | |
| Summer Power
(average kW): |
14000 |
| Winter Power (average kW): | 12500 |
| Fall/Spring (average kW): | 13000 |
| Summer Steam (average lb/hr @ conditions): | 150000 @ 150 psig 400 F |
| Winter Steam (average lb/hr @ conditions): | 200000 @ 150 psig 400 F |
| Fall/Winter Steam (average lb/hr @ conditions): | 165000 @ 150 psig 400F |
| Summer Chilled Water (tons/hr @ conditions): | 450 @ 45F water |
| Winter Chilled Water (tons/hr @ conditions): | 0 |
| Fall/Winter Chilled Water (tons/hr @ conditions): | 200 @ 45F water |
| Fuel type used (natural gas/liquid/other): | natural gas, diesel |
| Existing Equipment Data: | |
| Steam boiler
efficiency (percent HHV): |
60 |
| Chilled water system driver (power/steam/absorption): | Power, 1kW per ton |
| Upcoming capital expenses (expansion, replacement): | New boilers to be replaced at a cost of 750000 |
| Abnormal operating expenses due to mechanical condition: | Old chiller maintenance is 100000 per year |
| Current Energy Cost: | |
| Average power
cost (CNY/kW): |
0.048 |
| Average natural gas fuel cost (CNY/MMBtu): | 4.50 |
| Average liquid fuel cost (CNY/MMBtu): | 3.75 |
| If multiple fuel used, percent of each: | 85% natural gas, 15% liquid fuel |
| Additional Comments / Information: |
| a. plant has 50 MMBtu/hr of waste gas that is sent to the flare b. steam boiler blowdown is 15 percent of steam made c. plant would like to reduce environmental emissions |